General considerations in purchasing a
kiln:
Kiln
Body
- Internal size
- External size (will it fit the space you
have? does the kiln fit through the
doorways?)
- Single or three phase power available to
site/cost of three phase power
installation
- Weight of kiln (consider flooring
material)
- Position of kiln
(studio/classroom/storeroom/shed/verandah)
- Limitations on size of kiln
(budget/building/power/size of doorways)
- Past history with
kilns
- Future use/users of kiln – what will they
require?
- Maximum firing temp required 1100°C or
1300°C
Computerised
Controller
- Who will operate the kiln – single or
multiple users?
- Storage of programs required – who will be
responsible for setting the programs?
- Are you fitting controller to new/old kiln,
or are you setting one controller up to use on multiple kilns
(transferable)?
Kiln Vent System (this is not a hood and
fan)
- Extraction from top/bottom of
kiln?
- Where will fumes go – outdoors? Ceiling
cavity? Other?
- Is the kiln system in a classroom/studio or
separate room?
- Is there an existing
extraction device
- Extraction using an
independent hood/fan above the kiln (at what height? with what size
hood? can it be used on the new kiln?)
Installation of
Kiln/Extractor
- Current power on site: single/three
phase?
- Size of entrances to kiln area? Where will
the delivery vehicle park?
- Floor material in kiln room
(concrete/timber)?
- Quote by
electrician
- Door opening directions – hinges are on the
left hand side.
- Extraction via roof/floor/wall – what
building works are necessary? Consult a plumber and
electrician.
- Have you allowed storage for raw, bisqued,
awaiting glazing and finished fired ware in the kiln
area?
Kiln
Furniture
- Size of kiln interior vs. kiln shelf stack
(no. of shelves)
- 3 props per shelf – what
height/spaces?
- Cut full large shelves into ½ shelves for
easy loading? And healthy backs?
- How many shelves? What thickness? Max firing
temps?
- Compulsory: One thicker shelf on the kiln
floor to protect the soft brickwork/fibre
board.
- Batt wash all
shelves
Freight/Delivery
Requirements
- Access times/assistance with unloading –
people, unlocking, truck close to kiln site
etc.
- Impediments to delivery of kiln
(stairs/gravel/easy truck access to
site/distance/etc.)
- Country/interstate
delivery
- Crane truck/forklift/hand jack
required?
|